MAY 21
2015
PASS 2 violations
VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED
MUST REPAIR LEAK UNDER THE 2-COMP DESIGNATED HAND SINK.
PREMISES MAINTAINED FREE OF LITTER, UNNECESSARY ARTICLES, CLEANING EQUIPMENT PROPERLY STORED
MUST ELEVATE ALL ITEMS INSIDE THE STORAGE HUT UNIT 6 INCHES OFF THE FLOOR AT ALL TIMES LOCATED ACROSS FROM THE OUTSIDE CUSTOMER SITTING AREA.