PASS 4 violations
NO SPLASH GUARD PROVIDED BETWEEN THE THREE COMPARTMENT SINK AND METAL SHELF WERE CLEAN DISHES AND UTENSILS ARE STORED.
UNEVEN CEMENT ON FLOOR AT NORTH SIDE OF THE HOT WATER TANK,FLOOR MUST HAVE A SMOOTH,CLEANABLE AND NON-ABSORBENT MATERIAL. OBSERVED WATER ON FLOOR IN BASEMENT AREA,INSTRUCTED TO KEEP FLOOR DRY.
CEILING WALL ABOVE THE HOT WATER TANK IS PARTIALLY MISSING,INSTRUCTED TO PROVIDE ADDITIONAL CEILING WALL AT SAID AREA WITH A SMOOTH,CLEANABLE AND NON-ABSORBENT SURFACE
NO LIGHT SHIELD PROVIDED AT BASEMENT PREP AREA,INSTRUCTED TO PROVIDE.OBSERVED DEAD INSECTS AND DUST INSIDE THE LIGHT FIXTURE AT FIRST FLOOR DINING/PREP AREA INSTRUCTED TO CLEAN AND MAINTAIN.