NOV 12
2014
PASS 2 violations
WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
SEAL OPENING AROUND THE BATHROOM DOOR.
VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED
NO UTILITY/MOP SINK ON SITE. INSTRUCTED TO PROVIDE A UTILITY/ MOP SINK WITH HOT AND COLD RUNNING WATER UNDER CITY PRESSURE.