FEB 9
2026
PASS 5 violations
FLOORS, WALLS AND CEILINGS PROPERLY BUILT, MAINTAINED AND CLEAN
SIGNS POSTED; LAST INSPECTION REPORT AVAILABLE
PLUMBING: FIXTURES, BACKFLOW DEVICE, DRAINAGE
ADEQUATE HANDWASHING FACILITIES; SUPPLIED & ACCESSIBLE
NON-FOOD CONTACT SURFACES CLEAN