FEB 4
2026
PASS 5 violations
EQUIPMENT/UTENSILS APPROVED: INSTALLED; GOOD REPAIR; CAPACITY
ADEQUATE VENTILATION AND LIGHTING; DESIGNATED AREAS, USE
PLUMBING: FIXTURES, BACKFLOW DEVICE, DRAINAGE
WIPING CLOTHS: PROPERLY USED AND STORED
FLOORS, WALLS AND CEILINGS PROPERLY BUILT, MAINTAINED AND CLEAN