NOV 18
2025
PASS 5 violations
FLOORS, WALLS AND CEILINGS PROPERLY BUILT, MAINTAINED AND CLEAN
SIGNS POSTED; LAST INSPECTION REPORT AVAILABLE
ADEQUATE HANDWASHING FACILITIES; SUPPLIED & ACCESSIBLE
EQUIPMENT/UTENSILS APPROVED: INSTALLED; GOOD REPAIR; CAPACITY
PLUMBING: FIXTURES, BACKFLOW DEVICE, DRAINAGE