JAN 27
2026
PASS 5 violations
THERMOMETERS PROVIDED AND ACCURATE
PROPER HOT AND COLD HOLDING TEMPERATURES
EQUIPMENT/UTENSILS APPROVED: INSTALLED; GOOD REPAIR; CAPACITY
PLUMBING: FIXTURES, BACKFLOW DEVICE, DRAINAGE
HOT AND COLD WATER AVAILABLE