OCT 29
2025
PASS 6 violations
PROPER HOT AND COLD HOLDING TEMPERATURES
EQUIPMENT/UTENSILS APPROVED: INSTALLED; GOOD REPAIR; CAPACITY
ADEQUATE VENTILATION AND LIGHTING; DESIGNATED AREAS, USE
PLUMBING: FIXTURES, BACKFLOW DEVICE, DRAINAGE
EQUIPMENT, UTENSILS AND LINENS: STORAGE AND USE
IMPOUNDMENT/VOLUNTARY CONDEMN AND DISPOSE (VC&D)/SAMPLING