MAR 11
2026
PASS 6 violations
EQUIPMENT/UTENSILS APPROVED: INSTALLED; GOOD REPAIR; CAPACITY
PLUMBING: FIXTURES, BACKFLOW DEVICE, DRAINAGE
NON-FOOD CONTACT SURFACES CLEAN
THERMOMETERS PROVIDED AND ACCURATE
FLOORS, WALLS AND CEILINGS PROPERLY BUILT, MAINTAINED AND CLEAN
SIGNS POSTED; LAST INSPECTION REPORT AVAILABLE