Courtway Restaurant, L.l.c.
Passed most recently but 1 prior failure on record
2013-09-04 Pass Short Form Complaint 4 ▾
WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
MUST DETAIL CLEAN AND SANITIZE ALL WALLS AND CEILINGS IN THE KITCHEN AREA ABOVE COOKING EQUIPMENT AND DISH MACHINE TO REMOVE EXCESSIVE GRIME MIXED WITH EXCESSIVE DUST BUILD UP. ALSO DO SAME AS ABOVE IN THE BASEMENT AND DRY STORAGE ROOM.
LIGHTING: REQUIRED MINIMUM FOOT-CANDLES OF LIGHT PROVIDED, FIXTURES SHIELDED
MUST PROVIDE SHATTER PROOF LIGHT BULBS AT ALL UPRIGHT FREEZERS AND REFRIGERATORS AT ALL TIMES
VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED
MUST REPAIR COLD WATER FAUCET HANDLE AT THE SERVER HAND WASHING SINK BY THE SODA MACHINE. PRESENTLY A WRENCH IS BEING UTILIZED TO OPEN THE COLD WATER FAUCET.
REFRIGERATION AND METAL STEM THERMOMETERS PROVIDED AND CONSPICUOUS
MUST PROVIDE WORKING THERMOMETERS AT ALL REFRIGEARATORS, COLD HOLDING UNITS AND FREEZERS ON PREMISES AT ALL TIMES.
2013-08-22 Pass Canvass Re-Inspection 6 ▾
FOOD AND NON-FOOD CONTACT EQUIPMENT UTENSILS CLEAN, FREE OF ABRASIVE DETERGENTS
MUST DETAIL CLEAN AND SANITIZE INTERIOR OF DEEP FRYER ON THE 1ST FLOOR TO REMOVE CAKED ON GREASE.
FLOORS: CONSTRUCTED PER CODE, CLEANED, GOOD REPAIR, COVING INSTALLED, DUST-LESS CLEANING METHODS USED
MUST DETAIL CLEAN AND SANITIZE ALL FLOORS IN THE KITCHEN UNDER ALL HEAVY EQUIPMENT AND AT ALL CORNERS TO REMOVE EXCESSIVE GRIME BUILD UP. ALSO DETAIL CLEAN AND SANITIZE ALL FLOORS IN THE BASEMENT AREA UNDER HEAVY EQUIPMENT AND IN THE STORAGE ROOM.
WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
MUST DETAIL CLEAN AND SANITIZE ALL WALLS AND CEILINGS IN THE KITCHEN AREA ABOVE COOKING EQUIPMENT AND DISH MACHINE TO REMOVE EXCESSIVE GRIME MIXED WITH EXCESSIVE DUST BUILD UP. ALSO DO SAME AS ABOVE IN THE BASEMENT AND DRY STORAGE ROOM.
LIGHTING: REQUIRED MINIMUM FOOT-CANDLES OF LIGHT PROVIDED, FIXTURES SHIELDED
MUST PROVIDE SHATTER PROOF LIGHT BULBS AT ALL UPRIGHT FREEZERS AND REFRIGERATORS AT ALL TIMES.
VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED
MUST REPAIR COLD WATER FAUCET HANDLE AT THE SERVER HAND WASHING SINK BY THE SODA MACHINE. PRESENTLY A WRENCH IS BEING UTILIZED TO OPEN THE COLD WATER FAUCET.
REFRIGERATION AND METAL STEM THERMOMETERS PROVIDED AND CONSPICUOUS
MUST PROVIDE WORKING THERMOMETERS AT ALL REFRIGEARATORS, COLD HOLDING UNITS AND FREEZERS ON PREMISES AT ALL TIMES.
2013-08-15 Fail Canvass CRITICAL 11 ▾
FACILITIES TO MAINTAIN PROPER TEMPERATURE
DURING INSPECTION FOUND 1DR REFRIGERATOR NOT MAINTAINING TEMPERATURE IN THE BOTTOM PORTION. POTENTIALLY HAZARDOUS FOODS FOUND AT 40F AND BELOW AT THE TOP PORTION OF THE COOLER WAS ON ICE MAINTAINING PROPER TEMPERATURE AT TIME OF INSPECTION.THERE WAS ...
SANITIZING RINSE FOR EQUIPMENT AND UTENSILS: CLEAN, PROPER TEMPERATURE, CONCENTRATION, EXPOSURE TIME
DURING INSPECTION FOUND DISH MACHINE NOT SANITIZING PROPERLY AT 0PPM CHLORINE. DISH MACHINE MUST ALWAYS SANITIZE PROPERLY. DISH MACHINE TAGGED AT THIS TIME. CDI.
FOOD PROTECTED DURING STORAGE, PREPARATION, DISPLAY, SERVICE AND TRANSPORTATION
DURING INSPECTION IN THE INTERIOR PANEL OF THE ICE MACHINE OBSERVED A PINK SUBSTANCE AND A BLACK SUBSTANCE AT THE EDGE OF THE SAME PANEL IN THE ICE MACHINE.ICE (FOOD) AT ICE MACHINE IS NOT PROTECTED DURING STORAGE. MUST CLEAN AND SANITIZE INTERIOR OF...
* CERTIFIED FOOD MANAGER ON SITE WHEN POTENTIALLY HAZARDOUS FOODS ARE PREPARED AND SERVED
DURING INSPECTION AT 900AM THERE WAS NO VALID CITY OF CHICAGO CERTIFICATE OR CERTIFIED FOOD SERVICE MANAGER WHILE POTENTIALLY HAZARDOUS FOODS WERE BEING PREPARED. THERE MUST ALWAYS BE A CERTIFIED CITY OF CHICAGO FOOD SERVICE MANAGER PRESENT WHILE POT...
FOOD AND NON-FOOD CONTACT SURFACES PROPERLY DESIGNED, CONSTRUCTED AND MAINTAINED
MUST REPLACE BROKEN FLOUR CONTAINER LID LOCATED IN THE BASEMENT STORAGE AREA.
FOOD AND NON-FOOD CONTACT EQUIPMENT UTENSILS CLEAN, FREE OF ABRASIVE DETERGENTS
MUST DETAIL CLEAN AND SANITIZE INTERIOR OF DEEP FRYER ON THE 1ST FLOOR TO REMOVE CAKED ON GREASE. MUST DETAIL CLEAN AND SANITIZE ALL DISHES, SHELVING RACKS, AND LARGE WHITE CONTAINERS HOLDING FLOUR LOCATED IN THE BASEMENT STORAGE AREA TO REMOVE FO...
FLOORS: CONSTRUCTED PER CODE, CLEANED, GOOD REPAIR, COVING INSTALLED, DUST-LESS CLEANING METHODS USED
MUST DETAIL CLEAN AND SANITIZE ALL FLOORS IN THE KITCHEN UNDER ALL HEAVY EQUIPMENT AND AT ALL CORNERS TO REMOVE EXCESSIVE GRIME BUILD UP. ALSO DETAIL CLEAN AND SANITIZE ALL FLOORS IN THE BASEMENT AREA UNDER HEAVY EQUIPMENT AND IN THE STORAGE ROOM.
WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
MUST DETAIL CLEAN AND SANITIZE ALL WALLS AND CEILINGS IN THE KITCHEN AREA ABOVE COOKING EQUIPMENT AND DISH MACHINE TO REMOVE EXCESSIVE GRIME MIXED WITH EXCESSIVE DUST BUILD UP. ALSO DO SAME AS ABOVE IN THE BASEMENT AND DRY STORAGE ROOM.
LIGHTING: REQUIRED MINIMUM FOOT-CANDLES OF LIGHT PROVIDED, FIXTURES SHIELDED
MUST PROVIDE SHATTER PROOF LIGHT BULBS AT ALL UPRIGHT FREEZERS AND REFRIGERATORS AT ALL TIMES.
VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED
MUST REPAIR COLD WATER FAUCET HANDLE AT THE SERVER HAND WASHING SINK BY THE SODA MACHINE. PRESENTLY A WRENCH IS BEING UTILIZED TO OPEN THE COLD WATER FAUCET.
REFRIGERATION AND METAL STEM THERMOMETERS PROVIDED AND CONSPICUOUS
MUST PROVIDE WORKING THERMOMETERS AT ALL REFRIGEARATORS, COLD HOLDING UNITS AND FREEZERS ON PREMISES AT ALL TIMES.
2011-02-01 Pass Canvass 3 ▾
FLOORS: CONSTRUCTED PER CODE, CLEANED, GOOD REPAIR, COVING INSTALLED, DUST-LESS CLEANING METHODS USED
The floors shall be constructed per code, be smooth and easily cleaned, and be kept clean and in good repair. SEVERAL CRACKED FLOOR TILES NOTED UNDER DISH MACHINE.
WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
The walls and ceilings shall be in good repair and easily cleaned. PEELING PAINT ALL OVER BASEMENT PREP AREA CEILING, INSTRUCTED TO REMOVE AND MAINTAIN.
VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED
The flow of air discharged from kitchen fans shall always be through a duct to a point above the roofline. EXHAUST FAN AT FIRST FLOOR PREP AREA WALL WITH HEAVY DUST AND GREASE BUILD UP, INSTRUCTED TO CLEAN AND MAINTAIN. MUAT PROVIDE SINK STOPPERS ...
Data sourced from Chicago Dept. of Public Health ·
Score calculated from inspection outcomes, violation severity & recency.
· How we score
View official record on city data portal →
Eat or Beat scores are independent editorial analysis of public records and do not represent official government ratings.