AUG 8
2017
PASS 3 violations
FLOORS: CONSTRUCTED PER CODE, CLEANED, GOOD REPAIR, COVING INSTALLED, DUST-LESS CLEANING METHODS USED
MUST MAKE FLOOR IN WALK-IN COOLER SMOOTH AND EASILY CLEANABLE.
WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
REMOVE PEELING PAINT FROM BASEMENT WALL BEHIND 1-COMPARTMENT SINK AND PREP TABLE IN BASEMENT PREP AREA.
LIGHTING: REQUIRED MINIMUM FOOT-CANDLES OF LIGHT PROVIDED, FIXTURES SHIELDED
MUST PROVIDE ADEQUATE LIGHTING IN WALK-IN COOLER/FREEZER IN BASEMENT AREA.