SEP 24
2013
PASS 1 violation
WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
MUST REPAINT THE WALLS IN THE DRY STORAGE ROOM. PAINT OR REPLACE CEILING TILES WITH CHIPPED PAINT. MUST SCRAPE ANY LOOSE CAULKING FROM THE CEILING IN THE WALK-IN COOLER.