JUN 3
2014
PASS 2 violations
FLOORS: CONSTRUCTED PER CODE, CLEANED, GOOD REPAIR, COVING INSTALLED, DUST-LESS CLEANING METHODS USED
NOTED WET FLOORS AT THE BAR PREP AREA. INSTRUCTED TO CLEAN AND MAINTAIN DRY AT ALL TIMES
VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED
INSTRUCTED TO PROVIDE A SPLASH GUARD AT THE HAND WASH SINK BY THE FRONT PREP LINE.