PASS 6 violations
EMPTY CONTENTS AND CLEAN INTERIOR OF ICE MACHINE, INTERIORS OF CABINETS UNDERNEATH WASHBOWLS IN WASHROOMS AND CABINETS BEHIND THE BAR.
DETAIL CLEAN FLOORS ALONG WALL BASES, IN CORNERS, UNDERNEATH AND BEHIND ALL HEAVY EQUIPMENT THROUGHOUT BASEMENT. REPAIR SECTIONS OF FLOOR BY THE BAR THAT ARE NOT LEVEL.
SEAL ALL OPENINGS AROUND PIPE-FITTING(S) AND CRACK IN CORNER OF WALL IN WOMEN'S WASHROOM. RE-PAINT ALL WALLS WHERE AREAS ARE CHIPPED AND HAVE BEEN REPAIRED.
INSTALL SELF-CLOSING DEVICES ON WASHROOM DOORS.
INSTALL MOP SINK, AND A LONGER FAUCET ON 3 COMPARTMENT SINK BEHIND BAR.
ELIMINATE ALL CLUTTERED AREAS THROUGHOUT ALL SECTIONS OF BASEMENT. ELEVATE ALL ARTICLES AND STOCK, SO THAT ALL AREAS ARE ACCESSIBLE FOR CLEANING, SERVICING AND INSPECTION.