MAY 20
2013
PASS 2 violations
WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
MUST PROVIDE WALL COVING AT LOWER WALL IN BASEMENT WHERE NEEDED.
VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED
MUST INSTALL A BACKFLOW DEVICE AT UTILITY SINK AS REQUIRED.