PASS 6 violations
CLEAN INTERIOR OF FAN GUARD IN REACH-IN COOLER.
CLEAN ALL FLOOR DRAINS IN BASEMENT, BAR, AND PREP AREAS. CLEAN FLOORS UNDER ALL EQUIPMENT, ALONG WALLS AND IN ALL CORNERS IN PREP, STORAGE, AND BAR AREAS. REPLACE DAMAGED FLOOR TILES IN ALL AREAS.
SEAL ALL OPENINGS IN CEILINGS IN BASEMENT. REPAIR CEILING IN PREP AREA(WATER DAMAGE). REPLACE MISSING VENT COVER IN MEN WASHROOM AND SECOND FLOOR WASHROOM. CLEAN WALLS AND CEILINGS IN BASEMENT BEER WALK-IN COOLER(MOLD, SPILLS). SEAL OPENINGS ALONG BASEBOARDS IN FIRST FLOOR BAR AREA. REPLACE MISSING OUTLET AND LIGHT SWITCH COVERS IN SECOND FLOOR BAR AND WASHROOM AREAS.
PROVIDE LIGHT SHIELD OR SHATTERPROOF BULB IN BASEMENT DRY STORAGE AREA.
PROVIDE VENTILATION IN FIRST FLOOR MEN WASHROOM.
STORE ALL STOCK OFF FLOOR IN BASEMENT STORAGE AREAS. STORE MOP HEAD UPRIGHT TO PREVENT INSECT BREEDING. REMOVE ALL UNUSED ARTICLES AND EQUIPMENT IN BASEMENT TO PREVENT PEST HARBORAGE.