PASS 3 violations
The floors shall be constructed per code, be smooth and easily cleaned, and be kept clean and in good repair. Observed accumilated food debris/dirt build up inside floor drains. Must clean and maintain all unclean floor drains also must repair or replace all damaged floor tiles throughout prep area.
The walls and ceilings shall be in good repair and easily cleaned. Observed holes in walls under dishmachine drainboard and around pipe under pot wash 3-compartment sink. Must seal all holes in walls.
Ventilation: All plumbing fixtures, such as toilets, sinks, washbasins, etc., must be adequately trapped, vented, and re-vented and properly connected to the sewer in accordance with the plumbing chapter of the Municipal Code of Chicago and the Rules and Regulations of the Board of Health. Bar handwash bowl pipe leaking. Must repair and maintain sink.