JAN 25
2013
PASS 2 violations
WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
REPLACE STAIN/SOILED CEILING TILE IN WASHROOM.
VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED
NO MOP SINK ON PREMISES.MUST INSTALL,(HOT/COLD) WATER.ALSO REPAIR VENTILATION FAN IN WASHROOM IN POOR REPAIR.MUST REPAIR