MAR 22
2011
PASS 2 violations
FLOORS: CONSTRUCTED PER CODE, CLEANED, GOOD REPAIR, COVING INSTALLED, DUST-LESS CLEANING METHODS USED
The floors shall be constructed per code, be smooth and easily cleaned, and be kept clean and in good repair. CLEAN FLOORS UNDER THREE COMPARTMENT SINK AND KEEP FLOORS DRY AT THREE COMPARTMENT SINK AREA.
WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
The walls and ceilings shall be in good repair and easily cleaned. CLEAN VENTS ABOVE PREP AREA AND REAR DISH WASHING AREA.