PASS 7 violations
MUST REMOVE RUST FROM STORAGE RACKS IN WALK IN COOLER (PROTEIN). ALSO, DISCONTINUE USING MILK CRATES AS STORAGE RACKS THROUGHOUT ALL PREP AREAS, INSTALL CORRECT RACKS FOR PROPER FOOD STORAGE.
MUST CLEAN GREASE ACCUMULATION FROM WHEEL CASTERS ON HEAVY EQUIPMENT IN HOT LINE PREP AREA.
MUST RE-GROUT FLOORS IN HOT LINE PREP AREA.
MUST SEAL/REPAIR HOLES IN WALL AT THE TOP OF THE BASEMENT STAIRS. ALSO, REPAIR PEELING PAINT ON WALL ADJACENT TO BASEMENT. CLEAN GREASE ACCUMULATION FROM HOOD FILTERS IN HOT LINE PREP AREA.
MUST REPLACE BURNED OUT LIGHTS IN KITCHEN HOODS IN PREP AREA, SERVICE SIDE STATION, AND ABOVE THE ENTRANCE OF THE DISH MACHINE ROOM. ALSO CLEAN UNKNOWN DEBRIS FROM LIGHT SHIELD IN THE DISH MACHINE ROOM.
INCREASE HOT WATER PRESSURE AT THE 2ND EXPOSED HAND SINK IN THE LADIES TOILET ROOM ON THE 833 SIDE OF THE BUILDING. ALSO, THE 1ST STALL IN SAID TOILET ROOM IS NOT WORKING.
OBSERVED EMPLOYEE PERSONAL ITEMS IN DISH MACHINE AREA. INSTRUCTED TO PROVIDE DESIGNATED AREA FOR ALL EMPLOYEE PERSONAL ITEMS.