PASS 5 violations
TORN RUBBER DOOR GASKET ON THE COOKS LINE, RIGHT SIDE TWO DOOR COOLER. MUST REPLACE. MUST CAP/SEAL OPEN HOLES ON THE COOKS LINE METAL EXPOSED HAND SINK SPLASH GUARD.
INTERIOR OF THE COOKS LINE TWO DOOR COOLER (RIGHT SIDE) WITH DIRT AND FOOD DEBRIS. MUST CLEAN AND MAINTAIN. MUST REMOVE ALL WOOD DEBRIS, WOODEN PALLET AND ANY DEBRIS REMOVABLE FROM THE FLOORS AND WALLS INCLUDING THE GREASY METAL FAN INSIDE THE WOODEN WALK-IN COOLER. RUSTY METAL RACK SHELVING INSIDE THE FRONT WALK-IN COOLER. MUST REMOVE RUST OR REPLACE/RE-SEAL. DIRTY METAL RACK SHELVING INSIDE THE THREE DOOR (GLASS DOOR) REACH-IN COOLER. MUST CLEAN AND MAINTAIN.
MISSING BASEBOARD FLOOR COVING IN THE REAR WALK-IN COOLER. MUST REPLACE. MISSING AND DAMAGED FLOOR TILES IN THE FOLLOWING AREAS: AT THE MIDDLE AND REAR WALK-IN COOLERS.MUST REPLACE
OPEN CREVICES, SEAMS AND HOLES IN THE WALLS AND CEILINGS AT THE FOLLOWING AREAS MUST BE SEALED. UNDER/BEHIND THE THREE COMPARTMENT SINK. WALL ABOVE THE THREE COMPARTMENT SINK. WALL AT THE ICE MACHINE, THE REAR EXIT DOOR TO THE ALLEY AND AT THE REAR PREP MOP SINK. OPEN HOLE IN THE CEILING AT THE ENTRANCE TO THE REAR EQUIPMENT STORAGE ROOM. PEELING PAINT ABOVE THE THREE COMPARTMENT SINK AND PIZZA PREP AREA.MUST REMOVE. RAW WOODEN DOOR FRAME OF THE ELECTRICAL CLOSET. MUST PAINT/SEAL.
UNUSED "COCA-COLA" COOLER MUST BE REMOVED AND ALL UNNECESSARY ITEMS THROUGHOUT THE BASEMENT REMOVED AND ALL OTHER ITEMS STORED ELEVATED AND ORGANIZED.