JAN 8
2015
PASS 2 violations
FLOORS: CONSTRUCTED PER CODE, CLEANED, GOOD REPAIR, COVING INSTALLED, DUST-LESS CLEANING METHODS USED
OBSERVED GAPS BETWEEN THE BASEBOARDS AND THE WALL BEHIND THE COLLERS IN THE FRONT PREP AREA AND AT THE MOP SINK IN THE REAR. INSTRUCTED TO SEAL THE GAPS.
LIGHTING: REQUIRED MINIMUM FOOT-CANDLES OF LIGHT PROVIDED, FIXTURES SHIELDED
OBSERVED BLOWN LIGHT BULBS UNDER THE HOOD. INSTRUCTED TO PROVIDE AND MAINTAIN ADEQUATE LIGHTING.