DEC 5
2014
PASS 1 violation
WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
MUST CLEAN THE LIGHT BULBS IN THE PREP AREA TO REMOVE DEBRIS. ALSO NOTED A FEW CEILING TILES IN POOR REPAIR. MUST REPLACE AND MAINTAIN.