PASS 7 violations
INSTRUCTED TO SEAL RAW WOOD SECTIONS AT BAR LOCATED AT 115 E. 47TH STREET AND ICE MACHINE ROOM. PROVIDE COVERS FOR ICE BINS AT BARS. DEFROST REFRIGERATOR AT CONDENSERS INSIDE COOLER AT BAR. REPAIR WASH BOWL CABINETS IN TOILET ROOMS.
CLEAN AND SANITIZE THE FOLLOWING: INTERIOR OF THREE COMPARTMENTS SINKS, INTERIOR AND SIDES OF ICE MACHINES, WALLS AROUND THREE COMPARTMENT SINKS, ICE BINS, BEHIND BARS.
The floors shall be constructed per code, be smooth and easily cleaned, and be kept clean and in good repair. REPAIR FLOOR SECTIONS IN POOR REPAIR/ROTTED WOOD SECTIONS AT BARS. REPAIR CRACKED, BROKEN FLOOR SECTIONS AT BARS. PROVIDE SMOOTH, EASILY CLEANABLE SURFACE. REPAIR CRACKED FLOOR TILES IN TOILET ROOMS. CLEAN FLOORS THROUGHOUT BASEMENT AND 1ST. FLOOR IN STORAGE ROOMS AND BARS. REMOVE STANDING WATER IN BASEMENT AND MAINTAIN DRY. CLEAN FLOOR DRAINS IN BASEMENT.
The walls and ceilings shall be in good repair and easily cleaned. SEAL ALL OPENINGS AS NEEDED THROUGHOUT 1ST. FLOOR IE. STORAGE ROOMS, BARS, ICE MACHINES, REFRIGERATION UNITS, INSIDE CABINETS UNDER WASHBOWLS IN TOILET ROOMS AND SEAL CRACKS AND CREVICES ALONG WALL BASE. PROVIDE CEILING PANELS FOR MISSING SECTIONS ACROSS FROM TOILET ROOMS.
Toilet rooms shall be completely enclosed and shall be vented to the outside air or mechanically ventilated. PROVIDE SELF CLOSING DEVICES AT TOILET ROOM DOORS. PROVIDE MECHANICAL VENTILATION IN TOILET ROOMS.
PROVIDE BACKFLOW PREVENTION DEVICES AT WATER LINES AT ICE MACHINES. INCREASE HOT WATER PRESSURE AND REPAIR LEAK AT THREE COMPARTMENT SINK AT BAR LOCATED AT 113 E. 47TH ST. ON LEFT SIDE. INSTALL UTILTIY SINK WITH HOT AND COLD RUNNING WATER WITH BACKFLOW PREVENTION DEVICE AT FAUCET. PROVIDE SINK STOPPERS FOR DRAINS AT THREE COMPARTMENT SINKS
REMOVE FOOD CATERING EQUIPMENT/POTS/PANS FROM ICE MACHINE STORAGE ROOM, REMOVE GRILL AND CHARCOAL IN BASEMENT, AND ANY UNUSED ITEMS TO PREVENT PEST HARBORAGE.